Introduction

Tunnelling projects require a consistent, reliable power source to keep operations running smoothly. As these projects often occur in remote or underground locations, accessibility to power grids is limited or nonexistent. Critical operations such as tunnel boring machines, ventilation systems, and water pumps rely heavily on generator power to maintain efficiency and safety. However, even with a generator, power disruptions can still happen, causing costly delays and creating hazardous conditions. This is where Denyo SmartSYNC (Synchronisation) and SmartRMS (Remote Monitoring System) provide the solution to power disruptions. These smart technologies offer advanced generator power management and monitoring features that ensure efficient and uninterrupted power tailored to the specific needs of a tunnelling project. Let us explore how these systems optimise power management and streamline operations in these challenging environments.

How Denyo SmartSYNC Enhances Power Flow for Tunnelling Projects

High-capacity generators are often needed in tunnelling projects to meet the significant power demand. Denyo SmartSYNC technology enables multiple smaller-capacity generators to work together, meeting high power demands while ensuring a consistent power flow. Here’s how:

  • Load Distribution: Tunnelling projects involve running heavy-duty machinery such as tunnel boring machines and ventilation systems, which create fluctuating power demands. However, with Denyo SmartSYNC, multiple smaller capacity generators can share these loads efficiently, ensuring that power is distributed evenly. This minimises the stress on a single, high-capacity generator, prevents overloading, saves space, and helps extend the lifespan of the equipment.
  • Automatic Power Management: Power demands in tunnelling projects can change quickly, especially during peak operations or maintenance intervals. Denyo SmartSYNC’s automatic system adjusts generator usage according to real-time demand, activating or deactivating units as needed. For instance, during non-peak periods when power demand is low, fewer generators are activated, reducing fuel consumption while ensuring sufficient power is available.
  • Redundancy and Reliability: Tunnelling projects cannot afford power outages, as they could halt the operation of essential machinery and compromise worker safety. However, with Denyo SmartSYNC, even when one generator goes offline, others can instantly take over, ensuring a continuous power supply. This redundancy is vital in preventing costly downtimes and keeping you on track with project schedules.

How Denyo SmartRMS Simplify Generator Monitoring and Tracking for Tunnelling Projects

Tunnelling projects span long hours and often operate in remote locations, making it challenging for operators to manually oversee every generator. However, Denyo SmartRMS simplifies this process by offering remote, real-time monitoring, which allows operators to track the generator’s performance and ensure everything runs smoothly. Here’s how:

  • Real-Time Monitoring for Increased Productivity: Tunnelling operations are fraught with challenges and unexpected situations that necessitate consistent monitoring of generator performance to prevent delays or pauses. With Denyo SmartRMS, operators can monitor data such as load levels, fuel consumption, and generator health anywhere. This is especially useful in tunnelling projects where manual on-site inspection may be difficult or time-consuming. Operators can quickly identify inefficiencies by remotely monitoring the generators and making adjustments accordingly to ensure optimal power delivery for machinery and equipment.
  • Predictive Maintenance for Improved Safety: In tunnelling projects, unexpected generator failures can lead to serious safety risks such as ventilation loss or machinery shutdowns. However, Denyo SmartRMS enables predictive maintenance by monitoring and tracking the generator’s performance, identifying issues before they escalate. By scheduling maintenance in advance, operators can prevent unplanned downtime and ensure the project continues to run smoothly without safety risks.
  • Cost Efficiency through Remote Control: Tunnelling projects can span several kilometres with generators positioned at different points, powering different machinery or equipment. This is why the Denyo SmartRMS enables operators to remotely start/stop, locate, and monitor generators, thereby reducing the need for on-site interventions. This is especially beneficial in tunnelling projects where accessing specific locations might require considerable time and effort. By reducing the need for manual inspections, Denyo SmartRMS also lowers labour costs, making operations more efficient and cost-effective.

Why Denyo SmartSYNC and SmartRMS Are Ideal for Tunnelling Projects

The complex and demanding nature of tunnelling projects requires advanced power management solutions to keep operations running smoothly and safely. Denyo’s SmartSYNC and SmartRMS are designed to provide efficient generator synchronization, remote monitoring, and enhanced fuel savings – all while ensuring uninterrupted power in challenging environments. By integrating these technologies, tunnelling operations can increase productivity, reduce costs, and improve safety. Explore Denyo’s Smart Power Series and discover how our innovative SmartSYNC and SmartRMS can revolutionise your projects, or contact our Denyo specialist directly to find out more!



BACK TO TOP